check engine Citroen XSARA PICASSO 2004 1.G Service Manual

Page 171 of 523

Downloaded from www.Manualslib.com manuals search engine ENGINE
167
CHECKING AND SETTING THE VALVE TIMING
Engine: KFU
Tools.
[1]
Flywheel setting peg: 4507T
[2]Engine support crossmember:
[3]Crankshaft setting peg: ().0194.A
[4]Camshaft peg: 4533TA.C1
[5]Belt retaining pin: 4533T.AD
Removing.
Raise and support the vehicle, front wheels hanging.
Disconnect the battery.Remove:
The front RH wheel.
The front RH splashshield. The engine cover.
The accessories drive belt
(see corresponding operation).
The crankshaft pulley. The oil filter.
Remove the upper timing cover
(1).
B1BP2ZJD
C3

Page 172 of 523

Downloaded from www.Manualslib.com manuals search engine 168
ENGINECHECKING AND SETTING THE VALVE TIMING
Engine: KFU
B1BP2ZTC
Rotate the engine by means of the crankshaft pinion screw (2)(clockwise), to bring it to the pegging position.
Peg the flywheel, using tool
[1].
Position the tools
[3]and [4].
Position the tool
[2].
Support the engine.
Remove the screws
(3).
The upper RH engine support.
B1BP2MCCB1BP2MBCB1BP2ZUC
C3

Page 173 of 523

Downloaded from www.Manualslib.com manuals search engine ENGINE
169
CHECKING AND SETTING THE VALVE TIMING
Engine: KFU
Remove:
The lower engine support assembly(5)and the fixing screw (4).
Remove the lower timing cover (6).
Slacken the nut (7).
Remove the timing belt.
IMPERATIVE: Check that the tensioner roller turns freely (no tight spot).
Refitting.
Fit the (new)timing belt, in the following sequence:
Inlet camshaft pulley.
Exhaust camshaft pulley. Guide roller.
Crankshaft pulley.
Position the tool
[5].
Coolant pump pulley.
Dynamic tensioner roller.Remove tools
[3],[4]and [5].
B1CP0F2DB1CP0F1D
C3

Page 174 of 523

Downloaded from www.Manualslib.com manuals search engine 170
ENGINECHECKING AND SETTING THE VALVE TIMING
Engine: KFU
B1EP1DUC
Overtensioning the belt.Position «a»Tensioner roller in slackened position.
Position «b»Tensioner roller in normal position.
Position «c» Tensioner roller in overtensioned position.
Turn the tensioner roller (8)using an allen spanner at «e».
Position the index «d»in position «c», tension the belt to the maximum indicated.
Tighten the fixing nut of the tensioner roller to 2,1 ± 0,2 m.daN.
Rotate the crankshaft by 4 turns(normal direction of rotation).IMPERATIVE: Never turn the crankshaft backwards.Make sure the timing setting is correct by refitting the pegs [1], [3]and [4].
Remove the pegs [1], [3]and [4].
Adjusting the tension of the belt.Slacken the nut, holding the position of the tensioner roller, by means of an allen spanner at
«e».
Then bring the index «d»to its adjustment position «b».WARNING:The index «d»should not go past the notch «b».If it should do so, repeat the operation to
tension the timing belt.Maintain the tensioner roller
(8)in this position, using the allen spanner.
Tighten the fixing nut of the tensioner roller to 2,1 ± 0,2 m.daN.IMPERATIVE:The tensioner roller should not turn during the tightening of its fixing.If it should do
so, repeat the operation to tension the timing belt.
Refitting.
Complete the refitting in the opposite order to removal.
B1EP1DTC
C3

Page 175 of 523

Downloaded from www.Manualslib.com manuals search engine ENGINE
171
CHECKING AND SETTING THE VALVE TIMING
Engines: 6FZ RFN 2003 # NEW ASSEMBLY2003 #
(6)Crankshaft pinion
(7)Accessories drive pulley
(8)Washer
(9)Screw
The pinion
(6)is fitted as an idler on the crankshaft.
The accessories drive pulley
(7)is immobilised on the crankshaft by a halfmoon keyway and
by the tightening of washer
(8)and screw (9).
A:Pegging on manual gearbox.
B:Pegging on automatic gearbox.
The pegging of the crankshaft is done on the flywheel, or on the converter drive plate
(automatic gearbox).
The pegging hole on the cylinder block
(exhaust end)is calibrated and reinforced.
IMPERATIVE: Never turn the crankshaft with the accessories drive pulley slackened.
IMPERATIVE: Never remove the accessories drive pulley without pegging the crank
shaft and the camshafts.
IMPERATIVE: Always turn the crankshaft in the direction of engine rotation.
B1EP1B9D
B1BP2V2D
XSARA XSARA PICASSO

Page 176 of 523

Downloaded from www.Manualslib.com manuals search engine 172
ENGINECHECKING AND SETTING THE VALVE TIMING
NOTE: Checking and setting the timing # 2003: See Mechanic’s Handbook 2003: pages 163 to 173.
Tools.
[1]
Camshaft setting peg: () 0189.A
[2]Crankshaft setting peg: ().0189.R
[3]Timing belt retaining pin :().0189.K
[4]Adaptor for angular tightening: 4069T
[5]Tool for moving and locking the tensioner roller: ().0189.S
[5a] :().0189.S1
[5b] : ().0189 S2
Pliers for removing plastic pins: 7504T
Checking the setting of the timing.
Removing.
Disconnect the battery negative terminal (see corresponding operation).
Raise and support the vehicle, front wheels hanging.
Remove:
The front RH wheel.
The plastic pins
(1).
The splashshield (2).
The upper timing cover.
C4AP12TC
XSARA XSARA PICASSO
Engines: 6FZ RFN 2003 #

Page 177 of 523

Downloaded from www.Manualslib.com manuals search engine ENGINE
173
CHECKING AND SETTING THE VALVE TIMING
Engines: 6FZ RFN 2003 #
Checking the setting of the timing (continued).
A:
Pegging on the manual gearbox.
B:Pegging on the automatic gearbox.
Turn the engine by means of the crankshaft pinion screw, to bring it to the pegging position.
Peg the crankshaft, using tool
[2].
Peg the camshaft pulleys, using tool
[3].
NOTE:The pegs [3]should go in without effort.
WARNING:If the pegs go in only with difficulty, repeat the operation for fitting and
tensioning the timing belt
(see corresponding operation).
Refitting.
Remove tools [2]and [3].
Complete the refitting in reverse order to removal.
B1BP2V3D
B1EP1BAC
XSARA XSARA PICASSO

Page 178 of 523

Downloaded from www.Manualslib.com manuals search engine 174
ENGINECHECKING AND SETTING THE VALVE TIMING
Engines: 6FZ RFN 2003 #
Setting the timing.
Removing.
Disconnect the battery negative terminal (see corresponding operation).
Raise and support the vehicle, front wheels hanging.
Remove: The front RH wheel.
The plastic pins
(1).
The splashshield (2).
The accessories drive belt (see corresponding operation).
Unclip and move aside the fuel delivery hose from the timing cover.
Remove the upper timing cover
(1).
Turn the engine by means of the screw
(3)of the crankshaft pulley (2)to bring it to the pegging position.
B1BP2V4C
XSARA XSARA PICASSO

Page 179 of 523

Downloaded from www.Manualslib.com manuals search engine ENGINE
175
CHECKING AND SETTING THE VALVE TIMING
Engines: 6FZ RFN 2003 #
Setting the timing (continued).
A:
Pegging on the manual gearbox.
B:Pegging on the automatic gearbox.
Peg:
The crankshaft, using tool
[2].
The camshaft pulleys
(5)and (6), using tool [1].
Remove:
The screw
(3)of the crankshaft pulley (2).
The lower timing cover
(4)(by moving the engine).
IMPERATIVE: Never remove the crankshaft pulley (2) without pegging the crankshaft
and the camshafts.
Slacken the screw (9)of the tensioner roller (8).
Turn the tensioner roller
(8)(clockwise).
Remove the timing belt
(7).
I
MPERATIVE: Systematically replace the following components: timing belt, exhaust
manifold fixing nuts, timing belt tensioner roller nut.
B1BP2V3DB1EP1BBD
XSARA XSARA PICASSO

Page 180 of 523

Downloaded from www.Manualslib.com manuals search engine 176
ENGINECHECKING AND SETTING THE VALVE TIMING
Engines: 6FZ RFN 2003 #
Setting the timing (continued).Turn the tensioner roller (8), using tool [5a]to go beyond slot «b».
Position the tool [5b]to lock the index «a»and remove the tool [5a].
Reposition the timing belt (7)on the crankshaft pulley.
Hold the timing belt (7)in place using tool [3].
Fit the timing belt (7)in place, respecting the following order:
Guide roller (10).
Inlet camshaft pulley (6).
Exhaust camshaft pulley (5).
Coolant pump (11).
Tensioner roller (8).NOTE:Make so that the belt (7)is as flush as possible with the exterior face of the various
pinions and rollers.
Remove: Tool
[3].
Tool [1]from the exhaust camshaft pulley.
Tool [5b]from the tensioner roller (8).
Refit: The lower timing cover
(4)(by moving the engine). The crankshaft pulley (2).
Screw (3)of the crankshaft pulley
Tighten screw (3)to 4 ± 0,4 m.daN, then angular tighten to 53° ± 4°, tool [4].
B1EP1BCDB1EP1BDC
XSARA XSARA PICASSO

Page:   < prev 1-10 ... 11-20 21-30 31-40 41-50 51-60 61-70 71-80 81-90 ... 190 next >